TFBuilding Contractors
The extension taking shape

2025 Extension 12 photos

8 × 4 m rear extension

An 8 × 4 metre extension to the back of a home, adding a bedroom, a bathroom, a small hallway and a new living area.

This 8 × 4 m extension adds a bedroom, a bathroom, a small hallway and a living area to the back of the house. Three roof lights will bring daylight into the new rooms, and the extension is being built to an A2 BER rating.

The build is planned to take around three weeks. The photos so far follow the job from the garden before work started, through the groundwork and the slab, to the frame and cladding going up.

More photos to follow as the job progresses.

Photos 12

  1. The garden before work started
  2. Ground dug out and levelled
  3. Hardcore base and shuttering in place
  4. Ready for the slab
  5. Hardcore up to the back of the house
  6. Slab poured
  7. The new slab against the back wall
  8. Frame starting against the house
  9. Wall frames up on the slab
  10. Clad and glazed, work continuing inside
  11. Side view of the new extension
  12. The extension taking shape

← All projects

Planning something similar?

Tell Damian what you have in mind. Free estimate, no obligation.